Logan District blossoms as stage set for Matilda Building, a 57-unit mixed use project

The Matilda Building will rise on the Hamilton Corridor in the Logan District, with 57 apartment units and first-floor retail. Urban design abound. (PHOTO: Spokane Permits)

The Matilda Building will rise on the Hamilton Corridor in the Logan District, with 57 apartment units and first-floor retail. Urban design abound. (PHOTO: Spokane Permits)

In May, we reported on a major new mixed-use project set for construction on North Hamilton in the burgeoning Logan District. At that point, the “Hamilton Project” had just applied for a SEPA Review, the penultimate step in the process toward a building permit. Now, we understand, the project is just about ready to get underway.

The four-story mixed-use structure at 1008 N Hamilton will offer 57 one-, two-, and three-bedroom apartments aimed at young urban professionals, graduate students, and others interested in a University District living experience. A rooftop patio and barbecue will add to the available amenities. On the ground floor, over 17,000 square feet of retail space will be made available. One commercial unit has reportedly already been leased. Unfortunately, an excessively generous street setback may result in a more limited “urban”-style experience where people choose to access the storefronts via the parking lot, which will be located behind the building. Hopefully this grassy setback can be reduced to encourage people to commute to and from the Matilda Building by foot, bike, or transit.

Otherwise, we’re quite excited to see this project get underway, and we can’t help but notice the tremendous investment seen in the Logan District in recent years. If these projects succeed in urban form and character, there’s a potential for major disruption. There was Six on Hamilton. The Clementine Building. Gonzaga’s Boone Avenue Retail Center, or BARC. The John J. Hemmingson Center. And of course, the Hamilton Corridor Form-Based Code.

Are we witnessing the rebirth of Logan?

SHARE YOUR THOUGHTS: Are you excited for the construction of the Matilda Building, a major new mixed-use project on the Hamilton Corridor? Do you believe that this building, combined with other recent successes, will help herald a rebirth of the Logan District? Share your thoughts in the comments, on Facebook, on Twitter, and in person. We love to hear from you!

Advertisements

4 thoughts on “Logan District blossoms as stage set for Matilda Building, a 57-unit mixed use project

  1. Just judging from the render, that setback doesn’t look THAT bad. Might be nice for pedestrians not to have cars zooming right by them as they drive down Hamilton.

    • Indeed! I do think a generous setback is necessary there. My fear, though, is that the building’s retail will in essence become two-sided, with two ostensibly “front doors.” We know which door usually ends up being favored in these situations. The one on the parking side. We just need to make sure with projects like these that the primary, front entrance is on the street side of the building.

      • Gonzaga will also provide significant foot traffic from campus across the street. With the Boone Avenue Retail Center being redeveloped into Hamilton-facing retail facilities, there will be ample foot traffic coming from the front of the building.

        Any word on when the units will begin leasing, or who to contact?

  2. Pingback: Major new mixed-use housing development proposed in the University District | Spokane Rising

Engage

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s